EN / 中文

Application case —— Independent energy storage

Alxa Energy Storage power station project 5MW / 20 MWh

Project scale: 5MW / 20 MWh

Date of operation: December, 2024

Main applications: improve the power grid, improve the voltage quality and power grid safety and stability




On September 25th, the procurement announcement of 5MW / 20 MWh vanadium flow battery equipment of MCC Jingcheng-Alxa Energy Storage Power Station project was released. The procurement method is single source procurement, and it is planned to invite the supplier Sichuan Weide Energy Co., LTD.


The la shan la teng aobao 100000 kw / 400000 kWh grid energy storage power station project, was built in la shan union left flag wooden GaZha, a total area of about 40000 square meters, the construction capacity of 10 0000 kw / 400000 kilowatt-hours of energy storage facilities, including vanadium liquid flow battery (5MW / 20 MWh), lithium iron phosphate battery (95MW / 380 MWh), with vanadium liquid flow battery and lithium battery hybrid energy storage system good demonstration significance, will help to further improve the power grid load, a frequency modulation, inertia support ability, We will improve the voltage quality and power grid security and stability.


阿拉善



Media links:

https://mp.weixin.qq.com/s/yKFxrP99Eye5zD7DaCGPGg


Media related reports:

微信截图_20241101114657


上一条:Inner Mongolia settle mouth

下一条:Xinjiang v-liquid Light storag...